Menu Close

Sungurlu Dam Project

Place

İstanbul Province, Turkey

Client

General Directorate of State Hydraulic Works

Year

2014 - 2017

Description of Sungurlu Dam Project

The Project includes the final design of roller compacted concrete Sungurlu Dam and the appurtenant structures (spillway, bottom outlet, derivation tunnel, intake structure, downstream channel improvement, material access roads, main access roads), dam break analysis, risk assessment analysis, seismic hazard map reports, electrical and hydro-mechanical design drawings, cofferdams, conceptual hydroelectric power plant construction drawings, dynamic analysis, geological reports, geotechnical reports, determining borrow areas of construction materials, topographical surveys, geotechnical investigations, hydraulic studies, engineering designs and related cost analysis and financial and economic analysis.

 Main Features

  • Dam body type: Roller compacted concrete (RCC).
  • Height from the foundation : 95.50 m.
  • Maximum storage volume: 225.49 hm³.
  • Annual potable/industrial water capacity: 115.11 hm³
  • Power plant installed capacity and annual production: 3.3 MW / 21 GWh

Where to Find Us

Aşağı Öveçler Mah., 1314. Cd.
No: 10/13, 06460 Çankaya / Ankara – Turkey

Give Us a Call

Phone: +90 (312) 472 78 10

Fax: +90 (312) 472 78 11

Bar-Su Project

Our Brochure          Cookie Policy          Contact

Scroll Up