Menu Close

Çermik Kale Irrigation Project

Place

Diyarbakır Province, Turkey

Client

General Directorate of State Hydraulic Works, Turkey

Year

2014 - 2018

Description of Cermik Kale Irrigation Project

The Project is in Çermik of Diyarbakir Province in Turkey’s South-Eastern Anatolian Region. With the Project, the irrigation and drainage networks, which will irrigate 13,942 ha. of agricultural land, and the final design drawings of the structures on it have been prepared. The entire irrigation network has been designed as a pressure pipe network with diameters ranging from 110 mm to 3,100 mm, with a total length of about 409 km. In addition, 1 pumping station as well as a TBM tunnel was designed within the scope of the Project.

 Main Features

  • Water Source: Kale Dam
  • Total Irrigation Area: 13,942 ha
  • Gravity Irrigation Area: 7,111 ha
  • Pumped Irrigation Area: 6,831 ha
  • Irrigation Network: Medium and high pressure pipe irrigation system.
  • Gravity Main Pipeline Length: 29.617 km (9.375 km tunnel)
  • Cazibe Main Pipeline Flow: 14.152 m³/sec
  • Pumped Main Pipeline Length: 28.512 km
  • Pumped Main Pipeline Discharge: 7.17 m³/sec

Where to Find Us

Aşağı Öveçler Mah., 1314. Cd.
No: 10/13, 06460 Çankaya / Ankara – Turkey

Give Us a Call

Phone: +90 (312) 472 78 10

Fax: +90 (312) 472 78 11

Bar-Su Project

Our Brochure          Cookie Policy          Contact

Scroll Up